Skip to main content


Home Backout plan

Backout plan

Backout plan definition

A backout plan is a predefined strategy to reverse and recover from changes made to a system if the changes produce undesirable results. It's a safety measure that ensures data integrity and system availability.

See also: backup, recovery time objective, mean time to recovery

Key elements of a backout plan

  • Pre-change snapshot. Record of system's current state, configurations, and data using backups, system configurations, or database snapshots.
  • Triggers. Specify the conditions at which the backout plan would be activated. This might include system failures, unacceptable performance degradation, or other measurable metrics.
  • Step-by-step instructions. The plan should detail the steps you must take to revert the changes, including commands to run, scripts to execute, or configurations to restore.
  • Roles and responsibilities. Define who is responsible for which tasks during the backout process.
  • Communication plan. Decide how and when stakeholders will be notified when the backout plan is activated.
  • Testing. Test the backout plan to ensure it works as expected. Ideally, simulate the conditions triggering the backout in a separate test environment and execute the plan to restore the system to its previous state.
  • Documentation. Document every step, decision point, and action in the backout plan. This not only aids in the actual backout process but can be invaluable for post-mortem analysis or future reference.
  • Post-backout steps. After the system has been restored, additional steps may be required to verify system functionality, notify users, or monitor the system for further issues.
  • Review. After the backout plan has been executed, review the process to identify any improvements or refinements that might be needed.